Home » Departments » Highway » Permits and Records » Excavations

Excavations

An Excavation Permit must be obtained prior to any proposed excavation within the City right-of-way or on City property.  If the excavation requires the closure of a City street, or the closure or narrowing of a pedestrian walkway, an Encumbrance Permit will likely also be required.


Basic Requirements

Permittees must:

  • meet insurance and bonding requirements
  • submit and obtain approval of a traffic control/detour plan (as needed)
  • provide appropriate barricades, detour signage and traffic controls (as needed)
  • maintain a copy of the approved permit on site at all times

Excavation Permit Application

Terms and Conditions:

  1. Thoroughly read and understand all conditions including insurance needs, plans, contacts
  2. At least 48 hours notice
  3. Applicant must either mail, e-mail or fax us a well drawn out map with north arrow, streets, and sign placement, traffic detours and personnel
  4. Applicant must apply for an Encumbrance Permit if work is to block the entire street width.
  5. No work may proceed without the approved permit in hand.
  6. Applicant must either come in and pay by cash or check, pay by mail, or some other way, before they can get any permit.

In order to change or update your application please contact the Highway Department.

Once your application has been reviewed, you will be contacted (email, phone) regarding permit status.